No Logo
Commercial Building Permit - New Structure
Welcome to the Commercial Building Permit Application Portal
Please note the following application conditions:
  • A MySaanich profile is required to access the online application process. If you do not have a profile, register for one here.
  • Prior to starting the application, please refer to the New Structure Checklist for submission requirements. All requirements must be fulfilled for the application to be processed.
  • Access the Building Permit Document Guide for additional information on documentation requirements.
  • The application will timeout after 30 minutes of inactivity; draft applications will be saved for 15 days (and accessible through MySaanich "draft applications")
  • Application fee must be paid via credit card (2.4% convenience fee applies) upon application submission.
  • If you are an agent applying on the owner's behalf, you will be required to submit an Agent Authorization Form.
Plan Submission Requirements:
  • All documents must be in native PDF format, no scans permitted
  • Plans to be drawn to an acceptable drafting scale. For example. 1:50 (metric units preferred) or ¼” = 1 ft.
  • Maximum size of drawings 600mm x 900mm (preferred), or 24" x 36"

Submitting Documents:

Upon completion and payment of this application, you will be sent an email with a SharePoint link to upload the remainder of your documents. Upon receipt, please upload these files withing 2 business days. Your application will be on hold until all files received.

As Saanich continues to improve and streamline the Building Permit process, Plumbing work will now be included in the Building Permit application, eliminating the need for separate Plumbing permits.

**Please note: a separate Building Permit application is required for each structure**